Current through Bulletin No. 2024-21, November 1, 2024
Section R647-3-117 - Reports1. On or before January 31 of each year, unless waived in writing by the Division, each operator conducting small mining operations must file an operations and progress report (FORM MR-AR) describing its operations during the preceding calendar year, including: 1.11. The location of the operation and the number and date of the applicable Notice of Intention;1.12. The gross amounts of ore and waste materials moved during the year, as well as the disposition of such materials;1.13. New surface disturbances created during the year;1.14. The reclamation work performed during the year.;1.15. A narrative description of ore extraction, on-site primary processing, exploration, site development work, maintenance, reclamation, and other work performed at the mine site during the year;1.16. If notice has been provided or required pursuant to R647-3-113.4 or 113.5, the annual report shall include a narrative description of work performed to comply with R647-3-113.6.11 through 6.13;1.17. The date suspension began or is anticipated to begin; and1.18. Any other information required by the Division under R647-3-113.4 or 113.5.2. The operator shall keep and maintain timely records relating to his performance under the Act and still make these records available to the Division upon request.Utah Admin. Code R647-3-117
Amended by Utah State Bulletin Number 2020-04, effective 2/10/2020