Utah Admin. Code 647-2-105

Current through Bulletin No. 2024-21, November 1, 2024
Section R647-2-105 - Maps and Drawings

The notice of intention shall include a location map and an operations map. Each map shall be plotted at a scale to accurately identify locational landmarks and operation details.

1. The general location map shall be the scale of a USGS 7.5-minute series map or equivalent (1"=2000') and identify new or existing access roads.
2. The operations map (1"=200' or other scale as determined necessary by the Division) shall identify:
2.11 The area to be disturbed;
2.12 The location of any existing or proposed operations including access roads, drill holes, trenches, pits, shafts, cuts, or other planned exploration activities; and
2.13 Any adjacent previous disturbance for which the operator is not responsible.

Utah Admin. Code R647-2-105

Amended by Utah State Bulletin Number 2020-04, effective 2/10/2020