Current through Bulletin No. 2024-21, November 1, 2024
Section R647-2-102 - Duration of the Notice of Intention1. A Notice of Intention to Conduct Exploration that has been determined complete or, for operations of more than 5 10 acres has been approved, shall be valid until December 31st of the year following the year of submittal. All exploration and reclamation activities should be completed within this time frame. An operator desiring to extend the duration of a notice of intention, must notify the Division in writing, prior to expiration of the notice of intention, specifying the reasons an extension is required, and the anticipated length of time required to complete exploration and reclamation.2. The Division will review and approve the extension and adjust if necessary, the amount of reclamation surety3. Authorization to operate under a Notice of Intention to Conduct Exploration may be withdrawn in the event of failure by the operator to pay permit fees required by R647-2-101.6, or to maintain and update reclamation surety as required, after notice and opportunity for Board hearing.Utah Admin. Code R647-2-102
Amended by Utah State Bulletin Number 2020-04, effective 2/10/2020