These Rules and all subsequent revisions as approved and promulgated by the Board of Oil, Gas, and Mining (Board) of the State of Utah, are developed pursuant to the requirements of the Utah Mined Land Reclamation Act of 1975, Title 40, Chapter 8 of the Utah Code Annotated as amended (the Act). Section 40-8-2 of the Act states the findings of the Legislature.
In accordance with this legislative direction, these Rules recognize the necessity to balance the reclamation objectives of the Act with the physical, biological and economical constraints which may exist on successful reclamation. The Act and its revisions are hereby expressly incorporated herein by reference and made a part of these Rules.
There is intentional duplication in these rules. For example, the rule on hole plugging requirements is repeated in the section on Exploration, Small Mining Operations, and Large Mining Operations. This repetition is intended to benefit the Operator by putting all the rules relevant to a type of operation in the introductory section and in the section on that type of operation.
Utah Admin. Code R647-1-101