Current through Bulletin 2024-23, December 1, 2024
Section R317-16-5 - Operations Application ContentUnless otherwise determined in writing by the director, the application for operator certification approval shall include the following:
(1) all information required under Subsection R317-16-3(4), revised and updated to reflect the scale of the operations design;(2) a summary of any changes made as a result of the feasibility assessment;(3) a summary of findings establishing the operator's feasibility assessment had no negative impact on the biota or chemistry of GSL;(4) all data and data analysis related to GSL biota and chemistry derived from the feasibility assessment;(5) a UPDES permit application;(6) any other information related to the operation's impact to the biota or chemistry of GSL, as requested by the director; and(7) a statement that the proposed project will not negatively impact the biota or chemistry of GSL.Utah Admin. Code R317-16-5
Adopted by Utah State Bulletin Number 2024-17, effective 8/28/2024