A project may be authorized for a loan, credit enhancement agreement, interest buy-down agreement or hardship grant in writing by the Board following submission and favorable review of an application form, engineering report, if required, financial capability assessment and Staff feasibility report. The engineering report must include the preparation of a cost effective analysis according to Section R317-101-2. If it is anticipated that a project will be a candidate for financial assistance from the Board, the Staff should be contacted, and the plan of study for the engineering report, if required, should be approved before the planning is initiated.
Once the application form, plan of study, engineering report, and financial capability assessment are reviewed, the staff will prepare a project feasibility report for the Board's consideration in authorizing a project. The project feasibility report will include a detailed evaluation of the project with regard to the Board's funding priority criteria, and will contain recommendations for the type of financial assistance which may be extended, i.e., a loan, credit enhancement agreement, interest buy-down agreement or hardship grant.
Project authorization is not a contractual commitment and is conditioned upon the availability of funds at the time of loan closing, or signing of the credit enhancement, interest buy-down, or grant agreement and upon adherence to the project schedule approved at that time. If the project is not proceeding according to the project schedule the Board may withdraw the project authorization so that projects that are ready to proceed can obtain necessary funding. Extensions to the project schedule may be considered by the Board, but any extension requested must be fully justified.
Utah Admin. Code R317-101-14