Utah Admin. Code 309-700-3

Current through Bulletin 2024-23, December 1, 2024
Section R309-700-3 - Definitions and Eligibility

Subsection 73-10c-4(2)(1) limits eligibility for financial assistance under this section to political subdivisions.

Definitions for terms used in this rule are given in Rule R309-110. Definitions for terms specific to this rule are as follows:

"Asset Management Plan" A written plan developed by a water system to implement asset management or an asset management program within the system. The asset management plan describes the five core asset management components at Subsection R309-800-5(3) and provides an outline the water system can use to make appropriate improvements.

"Asset Management Program" The practice of managing infrastructure assets to maximize the efficiency and life expectancy of operating these assets while delivering the desired service levels.

"Board" means the Drinking Water Board.

"Credit Enhancement Agreement" means any agreement entered into between the Board, on behalf of the State, and an eligible water system to provide methods and assistance to eligible water systems to improve the security for and marketability of drinking water project obligations.

"Disadvantaged Communities" are defined as those communities located in an area which has a median adjusted gross income less than or equal to 80% of the State's median adjusted gross income, as determined by the Utah State Tax Commission from federal individual income tax returns excluding zero exemption returns, or where the estimated annual cost, including loan repayment costs, of drinking water service for the average residential user exceeds 1.75% of the median adjusted gross income. If, in the judgment of the Board, the State Tax Commission data is insufficient the Board may accept other measurements of the water users' income including local income surveys or questionnaires when there is a significant difference between the number of service connections for a system and the number of tax filing for a given zip code or city.

"Drinking Water Project" means any work or facility that is necessary or desirable to provide water for human consumption and other domestic uses. Its scope includes collection, treatment, storage, and distribution facilities; and also includes studies, planning, education activities, and design work that will promote protecting the public from waterborne health risks.

"Drinking Water Project Obligation" means any bond, note, or other obligation issued to finance all or part of the cost of acquiring, constructing, expanding, upgrading, or improving a drinking water project, including preliminary planning studies, surveys, engineering or architectural fees, and preparation of plans and specifications.

"Eligible Water System" means any community drinking water system owned by a political subdivision of the State.

"Emergency" means an unexpected, serious occurrence or situation requiring urgent or immediate action resulting from the failure of equipment or other infrastructure, or contamination of the water supply, threatening the health or safety of the public or water users.

"Financial Assistance" means a project loan, credit enhancement agreement, interest buy-down agreement, or technical assistance.

"Interest" means an assessment applied to loan recipients. The assessment shall be calculated as a percentage of principal.

"Interest Buy-Down Agreement" means any agreement entered into between the Board, on behalf of the State, and an eligible water system, to reduce the cost of financing incurred by an eligible water system on bonds issued by the subdivision for project costs.

"Project Costs" include the cost of acquiring and constructing any project including, without limitation: the cost of acquisition and construction of any facility or any modification, improvement, or extension of such facility; any cost incident to the acquisition of any necessary project, easement or right of way, engineering or architectural fees, legal fees, fiscal agents' and financial advisors' fees; any cost incurred for any preliminary planning to determine the economic and engineering feasibility of a proposed project; costs of economic investigations and studies, surveys, preparation of designs, plans, working drawings, specifications and the inspection and supervision of the construction of any facility; interest accruing on loans made under this program during acquisition and construction of the project; costs for studies, planning, education activities, and design work that will promote protecting the public from waterborne health risks; and any other cost incurred by the Board or the Department of Environmental Quality, in connection with the issuance of obligation to evidence any loan made to it under the law.

Utah Admin. Code R309-700-3

Amended by Utah State Bulletin Number 2023-11, effective 5/22/2023