Utah Admin. Code 309-500-9

Current through Bulletin 2024-23, December 1, 2024
Section R309-500-9 - Operating Permit
(1) The Division shall be informed when a public drinking water project, or a well-defined phase thereof, is at or near completion.
(2) The new or modified facility shall not be placed into service until an Operating Permit is issued by the Director unless it meets the requirements of R309-500-7.
(3) The Operating Permit will not be issued until all of the following items are submitted and found to be acceptable for all projects.
(a) Certification of Rule Conformance by a professional engineer that all conditions of Plan Approval were accomplished and if applicable, changes made during construction were in conformance with rules R309-500 through 550,
(b) as-built or record drawings incorporating all changes to approved plans and specifications, unless no changes are made from previously submitted and approved plans during construction,
(c) confirmation that a copy of the as-built or record drawings has been received by the water system owner,
(d) evidence of proper flushing and disinfection in accordance with the appropriate ANSI/AWWA Standard,
(e) where appropriate, water quality data,
(f) all other documentation which may have been required during the plan review process, and
(g) confirmation that the water system owner has been provided with an Operation and Maintenance manual for the new facility if applicable.
(4) Distribution lines (not including in - line booster pump stations) requiring Plan Approval may be placed into service prior to submittal of all of the above items and receipt of an Operating Permit if the public water system has received items (3)(a) and (3)(d).

Utah Admin. Code R309-500-9

Amended by Utah State Bulletin Number 2015-15, effective 7/15/2015
Amended by Utah State Bulletin Number 2017-23, effective 11/7/2017