Current through Bulletin 2024-20, October 15, 2024
Section R309-210-7 - Asbestos Distribution System Monitoring(1) The frequency of monitoring conducted to determine compliance with the maximum contaminant level for asbestos specified in R309-200-5(1) shall be conducted as follows: (a) Each community and non-transient non-community water system is required to monitor for asbestos during the first three-year compliance period of each nine-year compliance cycle beginning in the compliance period starting January 1, 1993.(b) If the system believes it is not vulnerable due to corrosion of asbestos-cement pipe, it may apply to the Director for a waiver of the monitoring requirement in paragraph (a) of this section. If the Director grants the waiver, the system is not required to monitor for asbestos.(c) The Director may grant a waiver based on a consideration of the use of asbestos-cement pipe for finished water distribution and the corrosive nature of the water.(d) A waiver remains in effect until the completion of the three-year compliance period. Systems not receiving a waiver must monitor in accordance with the provisions of paragraph (a) of this section.(2) A system vulnerable to asbestos contamination due solely to corrosion of asbestos-cement pipe shall take one sample at a tap served by asbestos-cement pipe and under conditions where asbestos contamination is most likely to occur.(3) A system vulnerable to asbestos contamination due both to its source water supply (as specified in R309-205-5(2)) and corrosion of asbestos-cement pipe shall take one sample at a tap served by asbestos-cement pipe and under conditions where asbestos contamination is most likely to occur.(4) A system which exceeds the maximum contaminant levels as determined in R309-205-5(1)(g) shall monitor quarterly beginning in the next quarter after the violation occurred.(5). The Director may decrease the quarterly monitoring requirement to the frequency specified in paragraph (a) of this section provided the Director has determined that the system is reliably and consistently below the maximum contaminant level. In no case can the Director make this determination unless a groundwater system takes a minimum of two quarterly samples and a surface (or combined surface/ground) water system takes a minimum of four quarterly samples.(6) If monitoring data collected after January 1, 1990 are generally consistent with the requirements of R309-210-7, then the Director may allow systems to use that data to satisfy the monitoring requirement for the initial compliance period beginning January 1, 1993.Utah Admin. Code R309-210-7