Current through Bulletin No. 2024-21, November 1, 2024
Section R307-405-18 - Public Participation(1) Except as provided in (2), the provisions of 40 CFR 51.166(q)(1) and (2) are hereby incorporated by reference.(2) The phrase "within a specified time period" in 40 CFR 51.166(q)(1) shall be replaced with the phrase "within 30 days of receipt of the PSD permit application".Utah Admin. Code R307-405-18