Utah Admin. Code 307-401-8

Current through Bulletin No. 2024-21, November 1, 2024
Section R307-401-8 - Approval Order
(1) The director will issue an approval order if the following conditions have been met:
(a) The degree of pollution control for emissions, to include fugitive emissions and fugitive dust, is at least best available control technology. When determining best available control technology for a new or modified source in an ozone nonattainment or maintenance area that will emit volatile organic compounds or nitrogen oxides, best available control technology shall be at least as stringent as any Control Technique Guidance document that has been published by EPA that is applicable to the source.
(b) The proposed installation will meet the applicable requirements of:
(i) Rule R307-403, Permits: New and Modified Sources in Nonattainment Areas and Maintenance Areas;
(ii) Rule R307-405, Permits: Major Sources in Attainment or Unclassified Areas (PSD);
(iii) Rule R307-406, Visibility;
(iv) Rule R307-410, Permits: Emissions Impact Analysis;
(v) Rule R307-420, Permits: Ozone Offset Requirements in Davis and Salt Lake Counties;
(vi) Rule R307-210, Standards of Performance for New Stationary Sources;
(vii) National Primary and Secondary Ambient Air Quality Standards;
(viii) Rule R307-214, National Emission Standards for Hazardous Air Pollutants;
(ix) Rule R307-110, General Requirements: State Implementation Plan; and
(x) all other provisions of Title R307.
(2) The approval order will require that all pollution control equipment be adequately and properly maintained.
(3) Receipt of an approval order does not relieve any owner or operator of the responsibility to comply with the provisions of Title R307 or the State Implementation Plan.
(4) To accommodate staged construction of a large source, the director may issue an order authorizing construction of an initial stage prior to receipt of detailed plans for the entire proposal provided that, through a review of general plans, engineering reports and other information the proposal is determined feasible by the director under the intent of Title R307. Subsequent detailed plans will then be processed as prescribed in this paragraph. For staged construction projects the previous determination under Subsections R307-401-8(1) and (2) will be reviewed and modified as appropriate at the earliest reasonable time prior to commencement of construction of each independent phase of the proposed source or modification.
(5) If the director determines that a proposed stationary source, modification or relocation does not meet the conditions established in (1) above, the director will not issue an approval order.

Utah Admin. Code R307-401-8

Amended by Utah State Bulletin Number 2016-1, effective 12/15/2015
Amended by Utah State Bulletin Number 2018-7, effective 3/5/2018
Amended by Utah State Bulletin Number 2020-18, effective 9/3/2020