Current through Bulletin No. 2024-21, November 1, 2024
Section R307-309-11 - Tailings Piles and Ponds(1) In addition to the requirements under R307-309-1 through R307-309-6, fugitive dust, construction activities, and roadways associated with tailings piles and ponds are regulated under the provisions of R307-309-11.(2) Any person owning or operating an existing tailings operation where fugitive dust results from grading, excavating, depositing, or natural erosion or other causes in association with such operation shall take steps to minimize fugitive dust from such activities. Such controls shall include:(b) Chemical stabilization or;(d) Vegetative covers or;(f) A combination of R307-309-11(2)(a) -(e);(g) Minimizing the area of disturbed tailings;(h) Restricting the speed of vehicles in and around the tailings operation; or(i) Other techniques which may be approvable by the director and upon concurrence by EPA. Utah Admin. Code R307-309-11
Amended by Utah State Bulletin Number 2017-17, effective 8/4/2017