Current through Bulletin No. 2024-21, November 1, 2024
Section R33-5-106.5 - Small Purchases Threshold for Construction Projects Using an Approved Vendor List(1) The small construction project threshold per individual project using an approved vendor list is a maximum of $2,500,000 for direct construction costs, including design and allowable furniture or equipment costs;(2) To ensure the fair and equitable treatment of all vendors on an approved vendor list, a procurement unit shall: (a) For individual construction projects up to a maximum of $25,000 contract with a vendor or contractor by direct award using one of the following methods to select the vendor or contractor: (i) A rotation system, organized alphabetically, numerically, or randomly;(ii) Assignment of vendors to a specified geographic area;(iii) Assignment of vendors based on each vendor's particular expertise or field; or(iv) Another method approved by the procurement official;(b) For individual construction projects over $25,000 up to a maximum of $100,000 by obtaining a minimum of two competitive quotes from vendors or contractors on the approved vendor list; (i) Procurement units shall use one of the following methods to select vendors from whom quotes are obtained: (A) A rotation system, organized alphabetically, numerically, or randomly;(B) Assignment of vendors to a specified geographic area;(C) Assignment of vendors based on each vendor's particular expertise or field; or(D) Another method approved by the procurement official;(ii) When using one of the methods listed in Subsection (2)(b) to select vendors to provide quotes, a procurement unit may also obtain an additional quote from the vendor that provided the lowest quote on the most recently completed procurement conducted by the procurement unit using the approved vendor list;(iii) When quotes or bids are obtained under Subsection (2)(b), procurement units shall purchase the procurement item from the vendor or contractor on the approved vendor list that provides the lowest quote for the procurement item; or(c) For individual construction projects over $100,000 up to a maximum of $2.5 million, by inviting all vendors or contractors on the approved vendor list to submit bids in accordance with the provisions set forth in Title 63G, Chapter 6a, Part 6, Bidding, except public notice requirements in Part 6 are waived.Utah Admin. Code R33-5-106.5
Adopted by Utah State Bulletin Number 2017-14, effective 6/21/2017Amended by Utah State Bulletin Number 2021-03, effective 1/22/2021Amended by Utah State Bulletin Number 2022-11, effective 5/23/2022