Current through Bulletin No. 2024-21, November 1, 2024
Section R33-112-704 - Conduct of Inspections(1) Inspections or tests shall be performed so as not to unduly delay the work of the contractor or subcontractor. No inspector may change the specifications or the contract without written authorization of the procurement official. The presence or absence of an inspector or an inspection may not relieve the contractor or subcontractor from any requirements of the contract.(2) When an inspection is made, the contractor or subcontractor shall provide without charge all reasonable facilities and assistance for the safety and convenience of the person performing the inspection or testing.Utah Admin. Code R33-112-704
Adopted by Utah State Bulletin Number 2024-15, effective 7/9/2024, exp. 11/6/2024 (Emergency)Adopted by Utah State Bulletin Number 2024-21, effective 10/22/2024