43 Tex. Admin. Code § 28.82

Current through Reg. 49, No. 49; December 6, 2024
Section 28.82 - Certification Required

An engineering firm must be certified under this subchapter before it may provide a report under § 28.86 of this subchapter (relating to Bridge Report) to be used by the department in determining the route for an oversize and overweight permit application for a superheavy load.

43 Tex. Admin. Code § 28.82

The provisions of this §28.82 adopted to be effective November 21, 2013, 38 TexReg 8251