Current through Reg. 49, No. 45; November 8, 2024
Section 19.16 - Long Range Utility Services Plan(a) Requirement. A state agency or institution of higher education that purchases utilities shall prepare a long range plan for the delivery of reliable, cost-effective utility services for the agency or institution.(b) Guidelines. SECO shall post guidelines for the Long Range Utility Services Plan on its website.(c) Frequency. The agency or institution shall update the Long Range Utility Services Plan at least every five years to support five-year construction and major renovation planning.(d) Posting/Submission. The plan shall be: (1) posted on a publicly available website; and(2) submitted to SECO upon request.34 Tex. Admin. Code § 19.16
The provisions of this §19.16 adopted to be effective August 13, 2002, 27 TexReg 7168; Amended by Texas Register, Volume 41, Number 14, April 1, 2016, TexReg 2494, eff. 4/7/2016