31 Tex. Admin. Code § 26.34

Current through Reg. 49, No. 45; November 8, 2024
Section 26.34 - Policies for Levee and Flood Control Projects
(a) Drainage, reclamation, channelization, levee construction or modification, or flood- or floodwater-control infrastructure projects shall be designed, constructed, and maintained to avoid the impoundment and draining of coastal wetlands to the greatest extent practicable. If impoundment or draining of coastal wetlands cannot be avoided, adverse effects to the wetlands shall be mitigated in accordance with the sequencing requirements in §26.23 of this title (relating to Policies for Development in Critical Areas).
(b) TCEQ rules and approvals for the levee construction, modification, drainage, reclamation, channelization, or flood- or floodwater-control projects, pursuant to the Texas Water Code, § 16.236, shall comply with the policies in this section.

31 Tex. Admin. Code § 26.34

The provisions of this §501.34 adopted to be effective October 6, 2004, 29 TexReg 9407; Entire chapter transferred from Title 31, Chapter 501 by Texas Register, Volume 47, Number 43, October 28, 2022, TexReg 7301, eff. 12/1/2022; Amended by Texas Register, Volume 48, Number 27, July 7, 2023, TexReg 3672, eff. 7/10/2023