Current through Reg. 49, No. 44; November 1, 2024
Section 335.121 - General Operating Requirements (Land Treatment Facilities)(a) Hazardous waste must not be placed in or on a land treatment facility unless the waste can be made less hazardous or nonhazardous by degradation, transformation, or immobilization processes occurring in or on the soil.(b) The owner or operator must design, construct, operate, and maintain a run-control system capable of preventing flow on to the active portions of the facility during peak discharge from at least a 100-year storm.(c) The owner or operator must design, construct, operate, and maintain a run-off management system capable of collecting and controlling a water volume at least equivalent to a 24-hour, 100-year storm.(d) Collection and holding facilities (e.g., tanks or basins) associated with run-on and run-off control systems must be emptied or otherwise managed expeditiously after storms to maintain design capacity of the system.(e) If the treatment zone contains particulate matter which may be subject to wind dispersal, the owner or operator must manage the unit to control wind dispersal.30 Tex. Admin. Code § 335.121
The provisions of this §335.121 adopted to be effective May 28, 1986, 11 TexReg 2347; amended to be effective July 14, 1987, 12 TexReg 2106.