The following map establishes the required area for sludge drying beds with aerobic sludges. For aerobic sludges, the value obtained from the map may be reduced by 35%.
30 Tex. Admin. Code § 317.12
The following map establishes the required area for sludge drying beds with aerobic sludges. For aerobic sludges, the value obtained from the map may be reduced by 35%.
30 Tex. Admin. Code § 317.12