Current through Reg. 49, No. 44; November 1, 2024
Section 311.79 - Performance CriteriaThe following performance criteria are applicable to all quarries located within a water quality protection area.
(1) Discharges from quarries shall meet the following effluent limitations. Attached Graphic
(2) Discharges from quarries resulting from a rainfall event greater than the 25-year, 24-hour rainfall event are not subject to effluent limitations in paragraph (1) of this section.(4) Results of analysis for monitoring conducted as specified in § 311.75(3) of this title (relating to Permit Application Requirements) shall be submitted monthly on approved self-report forms. Monitoring and reporting records, including strip charts and records of calibration and maintenance, shall be retained on site, or shall be readily available for review by a commission representative for a period of three years from the date of the record or sample, measurement, or report.(5) The permittee shall install a permanent rain gauge at the plant site and keep daily records of rainfall and the resulting flow. Monitoring records shall be retained on site, or shall be readily available for review by a commission representative for a period of three years from the date of the record.30 Tex. Admin. Code § 311.79
The provisions of this §311.79 adopted to be effective August 3, 2006, 31 TexReg 6033; Amended by Texas Register, Volume 49, Number 28, July 12, 2024, TexReg 5146, eff. 7/18/2024