30 Tex. Admin. Code § 230.3

Current through Reg. 49, No. 45; November 8, 2024
Section 230.3 - Certification of Groundwater Availability for Platting
(a) Certification. The certification required by this chapter must be prepared by a Texas licensed professional engineer or a Texas licensed professional geoscientist.
(b) Submission of information. The plat applicant shall provide to the municipal or county authority, the executive administrator of the Texas Water Development Board, and the applicable groundwater conservation district or districts the certification of adequacy of groundwater under the subdivision required by this chapter.
(c) Form required. This chapter and the following form shall be used and completed if plat applicants are required by the municipal or county authority to certify that adequate groundwater is available under the land to be subdivided. The executive director may make minor changes to this form that do not conflict with the requirements of these rules.

Attached Graphic

30 Tex. Admin. Code § 230.3

The provisions of this §230.3 adopted to be effective July 9, 2000, 25 TexReg 6345; amended to be effective Februay 13, 2003, 28 TexReg 1206; amended to be effective July 31, 2008, 33 TexReg 5933