A revised final control plan may be submitted by the owner or operator, along with any required permit applications. Such a plan must adhere to the emission specifications and the final compliance dates of this division (relating to Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Utility Electric Generation Sources). Replacement new units may be included in the control plan. The revision of the final control plan is subject to the review and approval of the executive director.
30 Tex. Admin. Code § 117.1356