Current through Reg. 49, No. 44; November 1, 2024
Section 117.456 - Revision of Final Control PlanA revised final control plan may be submitted by the owner or operator, along with any required permit applications. Such a plan must adhere to the requirements and the final compliance dates of this division (relating to Dallas-Fort Worth Eight-Hour Ozone Nonattainment Area Major Sources).
(1) For sources complying with § 117.405 of this title (relating to Emission Specifications for Reasonably Available Control Technology (RACT)) or § 117.410 of this title (relating to Emission Specifications for Eight-Hour Attainment Demonstration), replacement new units may be included in the control plan.(2) For sources complying with § 117.423 of this title (relating to Source Cap), any new unit must be included in the source cap, if the unit belongs to an equipment category that is included in the source cap.(3) The revision of the final control plan is subject to the review and approval of the executive director.30 Tex. Admin. Code § 117.456
The provisions of this §117.456 adopted to be effective June 14, 2007, 32 TexReg 3206; Amended by Texas Register, Volume 40, Number 25, June 19, 2015, TexReg 3984, eff. 6/25/2015