30 Tex. Admin. Code § 116.1414

Current through Reg. 49, No. 44; November 1, 2024
Section 116.1414 - Applications for Facilities that are Components of a Designated Project

Any application submitted under § 116.1404 of this title (relating to Permit Required) must include a completed Form PI-1, General Application for Air Preconstruction Permits and Amendments. The Form PI-1 must be signed by an authorized representative of the applicant. The Form PI-1 specifies additional support information that must be provided before the application is deemed complete. In order to be granted a permit, the applicant for a project as designated in § 116.1402(a) of this title (relating to Applicability) shall submit information to the commission that demonstrates that all of the following are met.

(1) Protection of public health and welfare. The emissions from the facility will comply with all applicable rules and regulations of the commission and with the intent of Texas Health and Safety Code, Chapter 382, the Texas Clean Air Act (TCAA), including protection of the health and physical property of the people.
(2) Measurement of emissions. The permit will have provisions for measuring the emission of significant air contaminants as determined by the commission. These provisions may include the installation of sampling ports on exhaust stacks and construction of sampling platforms in accordance with guidelines in the "Texas Natural Resource Conservation Commission Sampling Procedures Manual," portable analyzers, or emissions calculations if a known process variable is monitored.
(3) New Source Performance Standards (NSPS). The emissions from each affected facility as defined in 40 Code of Federal Regulations (CFR) Part 60 will meet the requirements of any applicable NSPS as listed under 40 CFR Part 60, promulgated by the United States Environmental Protection Agency (EPA) under the authority granted under Federal Clean Air Act (FCAA), §111, as amended.
(4) National Emission Standards for Hazardous Air Pollutants (NESHAPs). The emissions from each facility as defined in 40 CFR Part 61 will meet the requirements of any applicable NESHAPs, as listed under 40 CFR Part 61, promulgated by EPA under the authority granted under FCAA, §112, as amended.
(5) NESHAPs for source categories. The emissions from each affected facility shall meet the requirements of any applicable maximum achievable control technology standard as listed under 40 CFR Part 63, promulgated by EPA under FCAA, §112, or as listed in Chapter 113, Subchapter C of this title (relating to National Emission Standards for Hazardous Air Pollutants for Source Categories (FCAA, §112, 40 CFR Part 63)).
(6) Performance demonstration. The facility will achieve the performance specified in the permit application. The commission may require the applicant to submit additional engineering data after the permit has been issued in order to demonstrate further that the facility will achieve the performance specified in the permit. In addition, the commission may require initial compliance testing to determine ongoing compliance through engineering calculations based on measured process variables, parametric or predictive monitoring, stack monitoring, or stack testing.
(7) Nonattainment review. A facility in a nonattainment area shall comply with all applicable requirements under Subchapter B, Division 5 of this chapter (relating to Nonattainment Review).
(8) Prevention of significant deterioration review. A facility in an attainment area shall comply with all applicable requirements under Subchapter B, Division 6 of this chapter (relating to Prevention of Significant Deterioration Review).
(9) Air dispersion modeling or ambient monitoring. The commission may require computerized air dispersion modeling and/or ambient monitoring to determine the air quality impacts from the facility.
(10) Federal standards of review for constructed or reconstructed major sources of hazardous air pollutants. If the facility is an affected source as defined in § 116.15(1) of this title (relating to Section 112(g) Definitions), the affected source shall comply with all applicable requirements under Subchapter C of this chapter (relating to Hazardous Air Pollutants: Regulations Governing Constructed or Reconstructed Major Sources (FCAA, §112(g), 40 CFR Part 63)).
(11) Application content. In addition to any other requirements of this subchapter, the applicant shall:
(A) identify each facility to be included in the permit;
(B) identify the air contaminants emitted; and
(C) provide emission rate calculations.
(12) Best available control technology (BACT). The proposed facility will utilize BACT, with consideration given to the technical practicability and economic reasonableness of reducing or eliminating the emissions from the facility.

30 Tex. Admin. Code § 116.1414

The provisions of this §116.1414 adopted to be effective March 29, 2006, 31 TexReg 2492