Current through Reg. 49, No. 45; November 8, 2024
Section 101.360 - Level of Activity Certification(a) The owner or operator of any site subject to this division shall certify the historical level of activity for each affected facility by submitting to the executive director a completed application along with any supporting information such as usage records, testing or monitoring data, emission factors, and production records. The historical level of activity must be determined as follows: (1) for a facility in operation before January 1, 1997, the level of activity averaged over 1997, 1998, and 1999;(2) for an existing facility the level of activity authorized by the executive director; and(3) for a new or modified facility not in operation before January 1, 1997, that is subject to an emission specification under §§ 117.310, 117.1210, or 117.2010 of this title (relating to Emission Specifications for Attainment Demonstration; and Emission Specifications) first adopted after April 1, 2001, and either has submitted under Chapter 116 of this title (relating to Control of Air Pollution by Permits for New Construction or Modification) an application determined by the executive director to be administratively complete within 90 days of the effective date of this emission specification, or has qualified for a permit by rule under Chapter 106 of this title (relating to Permits by Rule) and commenced construction within 90 days of the effective date of the emission specification, the level of activity authorized by the executive director.(b) The owner or operator that certified a facility's allowable level of activity under subsection (a)(2) of this section shall: (1) no later than 90 days after the end of the fifth year of operation, certify the actual level of activity and actual emission factors for the two complete consecutive calendar years chosen as a baseline by submitting to the executive director a completed application, along with any supporting information such as usage records, testing or monitoring data, and production records; and(2) receive no benefit of allowances allocated based on actual operation until January 1 of the control period following the certification in paragraph (1) of this subsection.(c) The owner or operator of a site or facility that becomes subject to this division after March 31, 2001 shall certify the level of activity, as determined by the executive director, in accordance with subsections (a) and (b) of this section. The certification must be submitted no later than 90 days after the date the site or facility becomes subject to this division.30 Tex. Admin. Code § 101.360
The provisions of this §101.360 adopted to be effective January 18, 2001, 26 TexReg 282; amended to be effective October 18, 2001, 26 TexReg 8073; amended to be effective January 17, 2003, 28 TexReg 83; amended to be effective August 16, 2007, 32 TexReg 4985; Amended by Texas Register, Volume 40, Number 25, June 19, 2015, TexReg 3891, eff. 6/25/2015