28 Tex. Admin. Code § 5.4622

Current through Reg. 49, No. 43; October 25, 2024
Section 5.4622 - Inspection Verification

In submitting an Inspection Verification, Form WPI-2, or a Form WPI-2-BC-6, an appointed qualified inspector verifies that:

(1) the ongoing improvement:
(A) complies with the wind load requirements of the applicable building code;
(B) conforms to a design of the ongoing improvement that complies with the wind load requirements of the applicable building code under the plan of operation and that has a seal affixed by a professional engineer licensed by the Texas Board of Professional Engineers and Land Surveyors; or
(C) does not comply with the wind load requirements of the applicable building code; and
(2) if the ongoing improvement meets the requirements of paragraph (1)(A) or (B) of this section, the appointed qualified inspector is able to provide TDI with information and evidence substantiating compliance.

28 Tex. Admin. Code § 5.4622

Adopted by Texas Register, Volume 42, Number 02, January 13, 2017, TexReg 73, eff. 1/18/2017; Amended by Texas Register, Volume 45, Number 12, March 20, 2020, TexReg 2001, eff. 3/29/2020