If the closed facility is allowed to reopen within 90 calendar days, the relocated residents have the first right to return to the facility.
26 Tex. Admin. Code § 553.593
If the closed facility is allowed to reopen within 90 calendar days, the relocated residents have the first right to return to the facility.
26 Tex. Admin. Code § 553.593