26 Tex. Admin. Code § 510.130

Current through Reg. 49, No. 44; November 1, 2024
Section 510.130 - Record Drawings, Manuals and Design Data
(a) Manuals. Upon completion of the contract, the owner shall be furnished with a complete set of manufacturers' operating, maintenance, and preventive maintenance instructions;parts lists; and procurement information with numbers and a description for each piece of equipment. Facility staff shal1 also be provided with instructions on how to properly operate systems and equipment. Required information shall include energy ratings as needed for future conservation calculations.
(b) Design data. The owners shall be provided with complete design data for the facility. This shall include structural design loadings; summary of heat loss assumption and calculations; estimated water consumption; medical gas outlet listing; list of applicable codes; and electric power requirements of installed equipment. All such data shall be supplied to facilitate future alterations, additions, and changes, including, but not limited to, energy audits and retrofit for energy conservation.

26 Tex. Admin. Code § 510.130

The provisions of this §510.130 adopted to be effective January 1, 2004, 28 TexReg 5154; Chapter Transferred from Title 25, Part 1, Chapter 134 by Texas Register, Volume 44, Number 20, May 17, 2019, TexReg 2469, eff. 6/1/2019