Current through Reg. 49, No. 52; December 27, 2024
Section 96.23 - Electric Vehicle Supply Equipment Registration Changes(a) If the number of registered charging units increases at an existing location, prior to operation of the added devices, the electric vehicle supply provider must submit: (1) notice in a manner required by the department;(2) for charging units installed on or after March 1, 2025, a statement, affirmed by the provider that the charging unit was installed and operates in accordance with Occupations Code, Chapter 1305, and manufacturer specifications, and that the charging unit was in proper working order at the time of installation; and(3) the fee required under §96.80.(b) If a provider removes or decommissions a charging unit or units at a location, the provider must provide notice in a manner prescribed by the department.16 Tex. Admin. Code § 96.23
Adopted by Texas Register, Volume 49, Number 47, November 22, 2024, TexReg 9536, eff. 12/1/2024