Current through Reg. 49, No. 52; December 27, 2024
Section 65.211 - Preparation of Nonstandard Boilers for Inspection Nonstandard boilers shall be prepared for inspection as described in § RSA 65.210, with the following additional requirements.
(1) External lagging and insulation shall be removed and ultrasonic thickness measurements shall be performed for the first inspection and at five-year intervals for subsequent inspections; and (2) Any other inspections or examinations as required by the department shall be performed to determine the condition of the boiler.16 Tex. Admin. Code § 65.211
Adopted by Texas Register, Volume 40, Number 22, May 29, 2015, TexReg 3130, eff. 6/15/2015