Current through December 10, 2024
Section 1680-03-03-.09 - Termination of Participation(1) The Department or the contractor may inspect a business at any time during its contract period to assure that the business continues to meet the eligibility requirements set out in these rules.(2) The agreement between the contractor and the business shall contain provisions that cover breach of contract by the business. The following concepts shall be included within the provisions: (a) A business believed by the contractor to be breaching the contract, for any reason, shall be given a reasonable period of time to remedy the situation.(b) Should the business fail to remedy the situation, its logo sign(s) shall be removed and the contract terminated with no pro-ration of monies paid.Tenn. Comp. R. & Regs. 1680-03-03-.09
Original rule filed January 23, 1989; effective March 9, 1989. Rule has been assigned a new control number from 1680-09-01-.09 filed and effective February 1, 2003. Repeal and new rule filed May 14, 2014; effective 10/29/2014.Authority: T.C.A. § 54-5-1108.