Unless specifically defined in this chapter, the definitions from Chapter 1200-03-02 will apply. All terms defined in this chapter apply only to the provisions of this chapter.
Where:
m = number of pollutants emitted by sources included in the application;
n = total number of sources included in the application, excluding sources that are exempt from permitting in accordance with Rule 1200-03-09-.04;
E = emission rate in pounds per hour; and
h = hours per year (8,760 except as specified below).
For applications that do not list a maximum pound-per-hour emission rate for a particular pollutant or source, the responsible official shall use the potential emissions, in tons per year, as listed in the construction permit application. The responsible official may use a reduced emission rate or hours of operation if the same is limited by federal or state air quality regulation, limited by operational constraints within the process (i.e., a bottleneck), or the responsible official has requested a limitation of the same in the construction permit application. Emission of a greenhouse gas that is a regulated air pollutant solely because the pollutant is a constituent of greenhouse gases shall not be included when calculating the AMER. Emission of a hazardous air pollutant that is also a VOC or particulate matter shall be counted only as VOC or particulate matter. When calculating the AMER for particulate matter, the responsible official shall use the highest of the source's PM, PM10, or PM2.5 emission rate. For construction permit applications that include the retirement of existing sources or the reduction of emissions from existing sources, the AMER shall not include the emission reductions associated with such retirement or reduction of emissions.
General Permit Category | Construction and Modification Permit Application Fee |
Perchloroethylene and Petroleum Solvent Dry Cleaners | $100 |
Concrete batch plants | $100 |
Portable rock crushers | $100 |
Asphalt plants | $250 |
Air Curtain Incinerators | $500 |
SCHEDULE A - CONSTRUCTION PERMIT FEES FOR MINOR AND CONDITIONAL MAJOR SOURCES
Anticipated Maximum Emission Rate | (Filing/Processing) Permit Fee |
Less Than 10 Tons/Year | $100 |
10 to < 100 Tons/Year | $500 |
100 to < 250 Tons/Year | $1,000 |
250 to < 500 Tons/Year | $2,000 |
500 to< 1,000 Tons/Year | $3,000 |
1,000 to < 5,000 Tons/Year | $4,000 |
5,000 and Greater Tons/Year | $5,000 |
SCHEDULE I
Month the Annual Fee Is Due (Accounting Period) Counties in the Monthly Grouping
January | Anderson, Bedford, Benton, Bledsoe, Blount, Bradley, and Campbell |
February | Cannon, Carroll, Carter, Cheatham, Chester, Claiborne, Clay, and Cocke |
March | Coffee, Crockett, Cumberland, Davidson, Decatur, DeKalb, Dickson, Dyer, and Fayette |
April | Fentress, Franklin, Gibson, Giles, Grainger, Greene, and Grundy |
May | Hamblen, Hamilton, Hancock, Hardeman, Hardin, Hawkins, Haywood, and Henderson |
June | Henry, Hickman, Houston, Humphreys, Jackson, Jefferson, Johnson, Knox, Lake, Lauderdale, Lawrence, and Lewis |
July | Lincoln, Loudon, McMinn, McNairy, Macon, and Madison |
August | Marion, Marshall, Maury, Meigs, Monroe, Montgomery, Moore, and Morgan |
September | Obion, Overton, Perry, Pickett, Polk, Putnam, and Rhea |
October | Roane, Robertson, Rutherford, Scott, Sequatchie, Sevier, and Shelby |
November | Smith, Stewart, Sullivan, Sumner, Tipton, Trousdale, Unicoi, and Union |
December | Van Buren, Warren, Washington, Wayne, Weakley, White, Williamson, and Wilson |
General Permit Category | Combined Annual Emission Fee and Base Fee | Permit Review Fee |
Perchloroethylene and Petroleum Solvent Dry Cleaners | $0 | $0 |
Concrete Batch Plants with emissions less than 10 tons per calendar year | $0 | $0 |
Concrete Batch Plants with emissions greater than or equal to 10 tons per calendar year | $400 | $0 |
Portable rock crushers at True Minor Facilities | $1,000 | $0 |
Portable rock crushers at Conditional Major Facilities | $1,000 | $500 |
Asphalt Plants | $1,000 | $500 |
Allowable Tons Per Year | Review Fee |
0-50 | $250 |
50.1-100 TPY | $500 |
100.1-250 TPY | $1,000 |
250.1 and up | $2,000 |
Number of federal air quality standards | Base Fee |
0 | $10,000 |
1 | $15,000 |
2 to 3 | $20,000 |
4 to 5 | $30,000 |
6 to 10 | $40,000 |
11 to 20 | $50,000 |
21 and up | $75,000 |
Tenn. Comp. R. & Regs. 1200-03-26-.02
Authority: T.C.A. §§ 4-5-201, et seq.; 4-5-202, et seq.; 68-201-101, et seq.; 68-201-105, et seq.; and 68-203-103, et seq.