For any affected air contaminant source(s) at a facility, the Technical Secretary shall specify on the construction and/or operating permit(s) as permit conditions the emission limitation that is determined to be necessary under the provisions of this chapter. The permit(s) must be subjected to a public hearing and incorporated as a revision to the State Implementation Plan.
Tenn. Comp. R. & Regs. 1200-03-24-.04
Authority: T.C.A. §§ 68-25-105 and 4-5-201 et. seq.