S.D. Admin. R. 74:55:01:51

Current through Register Vol. 51, page 67, December 16, 2024
Section 74:55:01:51 - Excursion sampling frequency

During the time when any control parameter is present in a monitor well, a water sample shall be taken at least two times a week from the well. The samples must be analyzed for all control parameters within one week after the sample is taken.

S.D. Admin. R. 74:55:01:51

8 SDR 71, effective 12/24/1981; 13 SDR 129, 13 SDR 141, effective 7/1/1987; transferred from

General Authority: SDCL 34A-2-93(15).

Law Implemented: SDCL 34A-2-44.