The following construction requirements apply to injection wells and are in addition to the requirements listed in § 74:55:01:31:
All injection wells shall be constructed to prevent the migration of fluids to unauthorized zones. The casing and annular sealing material used in the construction of each newly drilled well shall be designed for the life expectancy of the well. In determining and specifying casing and annular sealing requirements, the following factors shall be considered:
S.D. Admin. R. 74:55:01:31.01
General Authority: SDCL 34A-2-93(15).
Law Implemented: SDCL 34A-2-32.