S.D. Admin. R. 74:53:01:22

Current through Register Vol. 51, page 67, December 16, 2024
Section 74:53:01:22 - Alternative method of determining wastewater flow capacity requirements for public parks and marinas

In lieu of calculating the wastewater flow capacity required pursuant to § 74:53:01:20, Table 4 may be used to determine wastewater flow capacity for public parks and marinas when the usage cannot be accurately determined. Flow projections, expressed as gallons per fixture per hour, are based on the related statistical flow figures per unit of plumbing fixture. To determine the flow capacity of the system, multiply the number of hours the facility is open by the flow figure for each fixture available as given in Table 4.

TABLE 4

Type of Fixture

Gallons/Hour

Faucets

15

Flush Toilets

35

Showers

100

Urinals

10

S.D. Admin. R. 74:53:01:22

12 SDR 2, effective 7/18/1985; 13 SDR 129, 13 SDR 141, effective 7/1/1987; transferred from

General Authority: SDCL 34A-2-93.

Law Implemented: SDCL 34A-2-20.