Section 74:52:03:26 - Requirements for monitoringAll permits shall specify the following requirements to ensure representative and accurate results:
(1) Requirements concerning the use, maintenance, and installation of monitoring equipment or methods, including biological monitoring methods as applicable;(2) Required type, intervals, and frequency of monitoring including, if appropriate, continuous monitoring; and(3) Applicable reporting frequencies and requirements based upon the impact of the regulated activity. Reporting shall be no less frequent then specified in the above regulation and consistent with §§ 74:52:03:12 and 74:52:03:13.S.D. Admin. R. 74:52:03:26
14 SDR 86, effective 12/24/1987; 19 SDR 122, effective 2/21/1993; transferred from General Authority: SDCL 34A-2-30.
Law Implemented: SDCL 34A-2-40, 34A-2-44.