S.D. Admin. R. 74:36:07:96

Current through Register Vol. 51, page 67, December 16, 2024
Section 74:36:07:96 - Operating permits for existing municipal solid waste landfills

The owner or operator of an existing municipal solid waste landfill having a design capacity less than 2.5 million megagrams by mass or 2.5 million cubic meters by volume is exempt from the obligation to obtain a Part 70 operating permit, if the existing municipal solid waste landfill is not required to obtain a Part 70 operating permit for a reason other than being subject to the requirements for an existing municipal solid waste landfill. For purposes of submitting a timely application for a Part 70 operating permit, the owner or operator of an existing municipal solid waste landfill with a design capacity greater than or equal to 2.5 million megagrams by mass and 2.5 million cubic meters by volume on the effective date of EPAs approval of the state's § 111(d) plan required in the Clean Air Act, and not otherwise subject to a Part 70 operating permit, shall submit an application for a Part 70 operating permit within 90 days after the effective date of EPAs approval of the state's § 111(d) plan required in the Clean Air Act.

The owner or operator is no longer subject to the requirement to maintain a Part 70 operating permit for the landfill if the landfill is closed and not otherwise subject to a Part 70 operating permit and if either of the following conditions are met:

(1) The landfill was never subject to the requirement to install and operate a gas collection and control system; or
(2) The landfill meets the conditions for control system removal criteria specified in § 74:36:07:144.

S.D. Admin. R. 74:36:07:96

46 SDR 064, effective 11/25/2019

General Authority: SDCL 34A-1-6.

Law Implemented: SDCL 34A-1-18.