Throughout the time when any control parameter is present in a monitor well, a water sample shall be taken at least two times a week from the well. The samples must be analyzed for all control parameters within one week after the sample is taken.
S.D. Admin. R. 74:29:11:37
General Authority: SDCL 45-6B-81.