Section 74:29:03:01 - Permit amendment required

A permit amendment is required for an increase of more than 20 percent of contiguous affected land within the permit area or for a minor modification of the terms and conditions of the operating or reclamation plans. Minor modifications include the following:

(1) An increase in milling or mining capacity;
(2) A change in the reclamation plan timetable; or
(3) The addition of ancillary facilities of a minor nature.

S.D. Admin. R. 74:29:03:01

14 SDR 111, effective 3/3/1988.

General Authority: SDCL 45-6B-81.