S.D. Admin. R. 74:11:08:07

Current through Register Vol. 51, page 56, November 4, 2024
Section 74:11:08:07 - Plugging flowing artesian test holes

All flowing artesian test holes shall be plugged with cement grout from the bottom of the hole to within three feet of the surface. Upon initial settling of the cement grout, the remainder of the test hole shall be plugged with topsoil or suitable material in a manner consistent with the specifications set forth in § 74:11:08:04.

S.D. Admin. R. 74:11:08:07

5 SDR 69, effective 2/20/1979; transferred from

General Authority: SDCL 45-6C-29, 45-6D-34.

Law Implemented: SDCL 45-6C-29, 45-6D-34.