In determining whether to grant or deny a permit application, the department may consider the size and location of the utility corridor, the availability of other locations for utility relocation or installation, the nature and extent of the proposed occupancy of the corridor, the ability to accommodate other utilities, and the effect on other permittees.
S.D. Admin. R. 70:10:01:08
General Authority: SDCL 31-19-1.1.
Law Implemented: SDCL 31-19-1.1.