Current through Register Vol. 51, page 67, December 16, 2024
Section 70:10:01:05 - Contents of applicationAn applicant shall submit a utility corridor permit application on a form approved by the department. The application shall include the following:
(1) The name and address of the applicant;(2) The description of the location of the utility corridor where the utility line or facility will be relocated or installed;(3) The type of utility installation requested;(4) Whether the utility line or facility has been displaced as a result of a highway construction project and, if so, the project that caused the displacement and the location of the utility line or facility prior to the displacement;(5) The name and address of the person to whom any notice required by these rules shall be given;(6) A proposed utility corridor installation plan or design;(7) Proof of liability insurance which is adequate for the liabilities presented; and(8) The signature of the applicant.S.D. Admin. R. 70:10:01:05
32 SDR 32, effective 8/30/2005.General Authority: SDCL 31-19-1.1.
Law Implemented: SDCL 31-19-1.1.