Current through Register Vol. 51, page 67, December 16, 2024
Section 70:04:02:24 - Furnishing, repairing, and installation of trailblazing business signsEach trailblazing sign shall be furnished, repaired, and installed as follows:
(1) A permittee shall furnish and repair each trailblazing sign, and the department shall install and remove each sign on state highways;(2) If a trailblazing sign is required on a roadway that is not under the jurisdiction of the department, the permittee shall be responsible for furnishing written approval from the appropriate highway authority allowing the sign to be placed in that authority's right-of-way. In addition, the permittee shall arrange to have the trailblazing sign installed by that authority prior to any business sign being installed at the interchange, intersection, or ramp;(3) A trailblazing sign to be installed on a state highway shall be delivered by the permittee to the point designated in the permit within 60 days after the date of notification that the trailblazing sign can be installed. Failure to timely deliver is cause for revocation of the permit. The department shall install signs within 10 days after delivery;(4) On any state highway the department shall install a repaired or replaced trailblazing sign within 10 days after delivery;(5) The department is not responsible for any damaged trailblazing sign;(6) On any state highway the department shall remove a trailblazing sign for repair or replacement within 10 days after notification by the permittee, and deliver it to the point designated in the permit; and(7) The department may remove a trailblazing sign and return it to the permittee if it is damaged or in need of repair or replacement.S.D. Admin. R. 70:04:02:24
40 SDR 102, effective December 3. 2013.General Authority: SDCL 31-29-80.1.
Law Implemented: SDCL 31-29-80.1.