S.D. Admin. R. 68:03:01:11

Current through Register Vol. 51, page 56, November 4, 2024
Section 68:03:01:11 - Tier 1 heavy industrial certified site

To be eligible for certification as a tier 1 heavy industrial certified site, the applicant shall file the following with GOED:

(1) All the documentation required for certification as a tier 2 heavy industrial certified site;
(2) Proof that the site is a minimum of five contiguous acres;
(3) Proof that the site is within 10 road miles of a four-lane highway or interstate highway;
(4) Proof that the electric service provider will provide service to the site at a voltage level that exceeds 12 kV;
(5) Certification from a service or utility provider that the site is capable of being equipped with, at a minimum, an eight inch water supply line and an eight inch sewer line;
(6) Certification from a service or utility provider that the site is capable of being equipped with a three inch high pressure natural gas supply line; and
(7) Any other documentation GOED may require to verify or support compliance with any of the requirements of this section.

S.D. Admin. R. 68:03:01:11

38 SDR 102, effective 12/7/2011; 40 SDR 122, effective 1/8/2014.

General Authority: SDCL 6-18-4.

Law Implemented: SDCL 6-18-2, 6-18-4.