S.D. Admin. R. 61:08:05:03

Current through Register Vol. 51, page 67, December 16, 2024
Section 61:08:05:03 - Positive flame failure cutoff required

Positive flame failure cutoff is required on automatically fired hot water supply boilers and oil or gas fired processing and heating boilers.

S.D. Admin. R. 61:08:05:03

SL 1975, ch 16, § 1; 5 SDR 61, effective 1/28/1979; 8 SDR 87, 8 SDR 134, effective 7/1/1982; 12 SDR 151, 12 SDR 155, effective 7/1/1986.

General Authority: SDCL 34-29A-16.

Law Implemented: SDCL 34-29A-24.