Water conditioning and treatment equipment contractors will be bound by any changes made by the administrative authority pertaining to materials used to install water conditioning and treatment equipment. All materials used in installing water conditioning and treatment equipment must conform to Section 604.0, Materials, of the Uniform Plumbing Code, 2015 edition.
S.D. Admin. R. 20:54:21:03
General Authority: SDCL 36-25-14, 36-25-15.
Law Implemented: SDCL 36-25-15
Uniform Plumbing Code, 2015 edition, International Association of Plumbing and Mechanical Officials. Copies may be obtained from the International Association of Plumbing and Mechanical Officials; 5001 East Philadelphia Street, Ontario, California 91761. Cost $143.