S.D. Admin. R. 20:51:31:27

Current through Register Vol. 51, page 67, December 16, 2024
Section 20:51:31:27 - Environmental monitoring requirements. Repealed

S.D. Admin. R. 20:51:31:27

36 SDR 100, effective 12/14/2009; 50 SDR 138, effective 6/2/2024

General Authority: SDCL 36-11-2.2, 36-11-11(1).

Law Implemented: SDCL 36-11-11.

Note: It is recommended that this be done using a pressure gauge or a velocity meter installed between the buffer area and ante area. In absence of a pressure gauge or velocity meter, unidirectional flow and velocity should be tested and documented semi-annually at the time of hood and room certification.