All grid work and related apparatus of a swimming pool must be inspected prior to pouring the cement or other covering of the pool. The installer shall schedule the inspection with the state electrical inspector at least 72 hours before pouring the cement or other pool covering.
S.D. Admin. R. 20:44:22:21
General Authority: SDCL 36-16-12.
Law Implemented: SDCL 36-16-27.