Current through Register Vol. 51, page 67, December 16, 2024
Section 20:10:39:44 - Data collection for the secondary neutral voltage drop test The following data is collected for each secondary neutral tested:
(1) Gauge and type of neutral wire;(2) Length of neutral wire;(4) Voltage drop between both ends of the secondary neutral being tested;(5) Cow contact voltage or cow contact current at the same points used in the 48 hour test;(6) Voltage from the primary neutral at the transformer to remote reference electrode; and(7) Voltage from secondary neutral in the service panel serving the area of the cow contact to remote reference electrode.S.D. Admin. R. 20:10:39:44
42 SDR 174, effective 6/21/2016General Authority: SDCL 49-47-2.
Law Implemented: SDCL 49-47-2, 49-47-3.